Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Secondary
Total Cost: $1,101,194.00
Total Funding: $1,101,194.00
System: Interstate
Total Cost: $40,000,000.00
Total Funding: $7,680,474.00
Scope: Transit
Total Cost: $4,590,000.00
Total Funding: $4,590,000.00
System: Primary
Total Cost: $18,724,268.00
Total Funding: $18,724,268.00
Hampton Boulevard Signal UpgradesHampton Boulevard, Route 337
System: Urban
Total Cost: $200,000.00
Total Funding: $200,000.00
Ocean View Avenue Signal UpgradesOcean View Avenue, Route 60
System: Urban
Total Cost: $800,000.00
Total Funding: $800,000.00
Total Cost: $3,294,614.00
Total Funding: $3,294,614.00
System: Urban
Total Cost: $1,587,217.00
Total Funding: $1,587,217.00
System: Enhancement
Total Cost: $1,078,850.00
Total Funding: $289,444.00
System: Secondary
Total Cost: $1,917,185.00
Total Funding: $1,777,057.00
System: Urban
Total Cost: $2,826,940.00
Total Funding: $2,826,940.00
System: Primary
Total Cost: $490,644.00
Total Funding: $490,644.00
System: Urban
Scope: Transit
Total Cost: $435,726.00
Total Funding: $435,726.00
System: Urban
Total Cost: $13,780,744.00
Total Funding: $16,529,110.00
System: Urban
Total Cost: $500,000.00
Total Funding: $500,000.00
Mount Pleasant Road WideningMount Pleasant Road, Route 165
System: Urban
Total Cost: $1,537,745.00
Total Funding: $1,537,745.00
System: Urban
Total Cost: $832,977.00
Total Funding: $832,977.00
System: Urban
Total Cost: $485,000.00
Total Funding: $528,223.00