Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Wythe Creek Road WideningWythe Creek Road, Route 172
System: Urban
Total Cost: $23,400,000.00
Total Funding: $14,025,502.00
System: Urban
Total Cost: $822,143.00
Total Funding: $911,173.00
I-264 Downtown Tunnel PPTADowntown Tunnel, Route 264
System: Interstate
Scope: R/W or Eng
Total Cost: $1,976,616.00
Total Funding: $1,976,616.00
System: Urban
Total Cost: $5,319,818.00
Total Funding: $5,319,818.00
System: Urban
Total Cost: $5,434,263.00
Total Funding: $4,876,827.00
System: Interstate
Total Cost: $11,787,466.00
Total Funding: $11,787,466.00
Midtown Tunnel PPTAMidtown Tunnel, Route 58
System: Primary
Total Cost: $10,000,000.00
Total Funding: $10,000,000.00
System: Primary
Total Cost: $10,124,892.00
Total Funding: $1,529,261.00
System: Interstate
Total Cost: $2,030,895.00
Total Funding: $2,030,895.00
System: Secondary
Total Cost: $351,319.00
Total Funding: $351,319.00
System: Urban
Total Cost: $103,573.00
Total Funding: $103,573.00
System: Urban
Total Cost: $2,117,182.00
Total Funding: $2,117,182.00
System: Interstate
Total Cost: $14,098,146.00
Total Funding: $14,098,146.00
System: Urban
Total Cost: $2,822,035.00
Total Funding: $2,822,035.00
System: Rail
Total Cost: $10,856,112.00
Total Funding: $10,856,112.00
System: Urban
Total Cost: $21,702,923.00
Total Funding: $21,702,923.00
Fort Eustis Boulevard Utility WorkFort Eustis Boulevard, Route 105
System: Primary
Total Cost: $1,361,257.00
Total Funding: $1,361,257.00
System: Urban
Total Cost: $3,786,764.00
Total Funding: $3,786,764.00