Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Scope: Transit
Total Cost: $2,138,199.00
Total Funding: $2,138,199.00
Scope: Transit
Total Cost: $10,695,070.00
Total Funding: $10,695,070.00
Scope: Transit
Total Cost: $12,603,116.00
Total Funding: $12,603,116.00
System: Primary
Total Cost: $924,790,724.00
Total Funding: $798,071,926.00
Scope: Transit
Total Cost: $6,105,638.00
Total Funding: $3,946,012.00
Scope: Transit
Total Cost: $9,000,000.00
Total Funding: $5,466,542.00
Scope: Other
Total Cost: $25,740,000.00
Total Funding: $1,166,000.00
Scope: Transit
Total Cost: $250,000.00
Total Funding: $250,000.00
Scope: Transit
Total Cost: $16,195,000.00
Total Funding: $3,314,000.00
Scope: Transit
Total Cost: $10,875,000.00
Total Funding: $557,279.00
System: Interstate
Total Cost: $48,543,514.00
Total Funding: $48,543,514.00
System: Primary
Total Cost: $1,540,364,778.00
Total Funding: $1,540,364,778.00
Scope: Transit
Total Cost: $677,389.00
Total Funding: $677,389.00
Scope: Transit
Total Cost: NA
Total Funding: $66,000.00
Scope: Transit
Total Cost: NA
Total Funding: $680,000.00
Scope: Transit
Total Cost: NA
Total Funding: $472,000.00
Scope: Transit
Total Cost: NA
Total Funding: $272,000.00
Scope: Transit
Total Cost: NA
Total Funding: $270,000.00