Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $26,865,376.00
Total Funding: $21,887,574.00
System: Urban
Total Cost: $4,962,831.00
Total Funding: $6,755,514.00
System: Urban
Total Cost: $1,478,352.00
Total Funding: $1,478,352.00
System: Urban
Total Cost: $1,272,186.00
Total Funding: $1,187,075.00
System: Urban
Total Cost: $450,000.00
Total Funding: $450,000.00
System: Urban
Total Cost: $868,933.00
Total Funding: $1,000,000.00
System: Urban
Total Cost: $461,476.00
Total Funding: $461,476.00
System: Urban
Total Cost: $2,525,000.00
Total Funding: $3,523,200.00
System: Urban
Total Cost: $1,000,000.00
Total Funding: $1,271,217.00
System: Urban
Total Cost: $285,905.00
Total Funding: $233,098.00
System: Urban
Total Cost: $285,000.00
Total Funding: $285,124.00
System: Primary
Total Cost: $3,205,342.00
Total Funding: $3,814,518.00
System: Urban
Total Cost: $1,011,191.00
Total Funding: $1,100,000.00
System: Primary
Total Cost: $6,940,354.00
Total Funding: $6,744,159.00
Total Cost: $551,894.00
Total Funding: $453,857.00
System: Primary
Total Cost: $59,398,356.00
Total Funding: $1,411,665.00
System: Interstate
Total Cost: $4,976,355.00
Total Funding: $6,171,354.00
System: Interstate
Total Cost: $104,902,350.00
Total Funding: $12,128,522.00
System: Urban
Total Cost: $1,450,000.00
Total Funding: $1,623,463.00
System: Secondary
Total Cost: $468,658.00
Total Funding: $2,015,954.00