Home » TIP Projects
Unmapped Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Total Cost: $400,000.00
Total Funding: $400,000.00
System: Interstate
Total Cost: $310,000.00
Total Funding: $645,371.00
System: Interstate
Total Cost: $500,000.00
Total Funding: $695,371.00
System: Primary
Total Cost: $1,161,704.00
Total Funding: $1,727,828.00
System: Primary
Total Cost: $155,000.00
Total Funding: $315,500.00
Scope: Transit
Total Cost: $2,247,000.00
Total Funding: $2,247,000.00
Total Cost: $2,500,000.00
Total Funding: $2,500,000.00
System: Primary
Total Cost: $6,562,821.00
Total Funding: $6,562,821.00
System: Urban
Total Cost: $1,000,000.00
Total Funding: $1,000,000.00
System: Urban
Total Cost: $460,000.00
Total Funding: $460,000.00
System: Urban
Total Cost: $260,000.00
Total Funding: $260,000.00
System: Urban
Total Cost: $135,000.00
Total Funding: $135,000.00
System: Urban
Total Cost: $150,000.00
Total Funding: $150,000.00
System: Urban
Total Cost: $600,000.00
Total Funding: $600,000.00
System: Urban
Total Cost: $698,000.00
Total Funding: $698,000.00