Home » TIP Projects
Unmapped Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
ADP SoftwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $9,504,000.00
Scope: Transit
Total Cost: NA
Total Funding: $916,000.00
Scope: Transit
Total Cost: NA
Total Funding: $19,662,000.00
Scope: Transit
Total Cost: NA
Total Funding: $7,062,000.00
Scope: Transit
Total Cost: NA
Total Funding: $95,000.00
Scope: Transit
Total Cost: NA
Total Funding: $4,740,000.00
Scope: Transit
Total Cost: NA
Total Funding: $704,000.00
Scope: Transit
Total Cost: NA
Total Funding: $45,000.00
Scope: Transit
Total Cost: $8,857,000.00
Total Funding: $8,857,000.00
Scope: Transit
Total Cost: NA
Total Funding: $175,000.00
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Scope: Transit
Total Cost: NA
Total Funding: $144,000.00
System: Interstate
Total Cost: $880,034.00
Total Funding: $1,000,000.00
System: Urban
Total Cost: $195,000.00
Total Funding: $195,000.00
System: Urban
Total Cost: $500,000.00
Total Funding: $632,945.00
System: Urban
Total Cost: $900,000.00
Total Funding: $1,069,740.00