Home » TIP Projects
Unmapped Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Ferry BoatNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $7,428,000.00
Scope: Transit
Total Cost: NA
Total Funding: $852,000.00
Emergency DrillNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $64,000.00
Scope: Transit
Total Cost: NA
Total Funding: $7,700,000.00
Scope: Transit
Total Cost: NA
Total Funding: $2,818,000.00
Scope: Transit
Total Cost: NA
Total Funding: $3,421,000.00
Scope: Transit
Total Cost: NA
Total Funding: $11,915,000.00
Scope: Transit
Total Cost: NA
Total Funding: $705,000.00
Scope: Transit
Total Cost: NA
Total Funding: $684,000.00
Scope: Transit
Total Cost: NA
Total Funding: $1,272,000.00
Scope: Transit
Total Cost: NA
Total Funding: $2,117,000.00
Scope: Transit
Total Cost: NA
Total Funding: $7,971,000.00
Scope: Transit
Total Cost: NA
Total Funding: $302,000.00
Scope: Transit
Total Cost: NA
Total Funding: $765,000.00
ADA OperationsNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $10,663,000.00
Scope: Transit
Total Cost: NA
Total Funding: $13,098,000.00
Scope: Transit
Total Cost: NA
Total Funding: $143,365,000.00
Portable RadiosNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Scope: Transit
Total Cost: NA
Total Funding: $75,750,000.00
ADP HardwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $2,124,000.00