Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $11,178,154.00
Total Funding: $12,762,921.00
Midtown Tunnel PPTAMidtown Tunnel, Route 58
System: Primary
Scope: R/W or Eng
Total Cost: $606,036.00
Total Funding: $606,036.00
Mercury Boulevard StreetscapingMercury Boulevard, Route 258
System: Urban
Total Cost: $1,747,979.00
Total Funding: $1,747,979.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $4,718,400.00
Total Funding: $4,718,400.00
System: Urban
Total Cost: $3,012,000.00
Total Funding: $762,491.00
System: Urban
Total Cost: $12,907,147.00
Total Funding: $16,255,193.00
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $16,154,740.00
Total Funding: $16,154,740.00
System: Urban
Total Cost: $12,050,000.00
Total Funding: $14,486,271.00
System: Secondary
Total Cost: $14,742,540.00
Total Funding: $15,618,918.00
System: Interstate
Total Cost: $124,551,367.00
Total Funding: $7,832,371.00
System: Urban
Total Cost: $1,710,797,322.00
Total Funding: $8,005,776.00
Fort Eustis Boulevard WideningFort Eustis Boulevard, Route 105
System: Primary
Total Cost: $3,085,581.00
Total Funding: $3,086,803.00
System: Primary
Total Cost: $62,410,432.00
Total Funding: $3,250,000.00
System: Urban
Total Cost: $28,935,344.00
Total Funding: $28,935,344.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $42,872,452.00
Total Funding: $42,872,452.00