Administrative Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work - Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Interstate
Total Cost: 6500000
Total Funding: 11352527
System: Interstate
Total Cost: 202974
Total Funding: 202974
System: Urban
Total Cost: 656600
Total Funding: 657745
System: Urban
Total Cost: 1587217
Total Funding: 1587217
Mount Pleasant Road WideningMount Pleasant , Route 165
System: Urban
Total Cost: 30046326
Total Funding: 1537745
System: Urban
Total Cost: 807617
Total Funding: 1000000
System: Urban
Total Cost: 4718400
Total Funding: 4718400
System: Primary
Total Cost: 344523702
Total Funding: 344942837
Hampton Boulevard ReconstructionHampton Boulevard , Route 337
System: Urban
Total Cost: 104318752
Total Funding: 104318752
Warwick Boulevard RelocationWarwick Boulevard , Route 60
System: Urban
Total Cost: 18219124
Total Funding: 1600000
System: Primary
Total Cost: 62410432
Total Funding: 3250000
System: Urban
Total Cost: 28935344
Total Funding: 28935344
System: Urban
Total Cost: 181527945
Total Funding: 181533677