Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Total Cost: $97,508.00
Total Funding: $98,508.00
System: Secondary
Total Cost: $88,786.00
Total Funding: $88,786.00
System: Secondary
Total Cost: $351,319.00
Total Funding: $351,319.00
System: Secondary
Total Cost: $28,379.00
Total Funding: $28,379.00
System: Urban
Total Cost: $19,215,146.00
Total Funding: $19,214,901.00
Wythe Creek Road WideningWythe Creek Road, Route 172
System: Urban
Total Cost: $23,400,000.00
Total Funding: $14,025,502.00
System: Urban
Total Cost: $260,000.00
Total Funding: $260,000.00
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $16,154,740.00
Total Funding: $16,154,740.00
Witchduck Road WideningWitchduck Road, Route 190
System: Urban
Total Cost: $52,963,968.00
Total Funding: $63,627,456.00
System: Urban
Total Cost: $1,587,217.00
Total Funding: $1,587,217.00
System: Primary
Total Cost: $59,398,356.00
Total Funding: $1,411,665.00
System: Urban
Total Cost: $12,303,242.00
Total Funding: $13,267,702.00
Scope: Transit
Total Cost: $9,000,000.00
Total Funding: $5,466,542.00
System: Urban
Total Cost: $2,826,940.00
Total Funding: $2,826,940.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $42,872,452.00
Total Funding: $42,872,452.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $4,718,400.00
Total Funding: $4,718,400.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $11,178,154.00
Total Funding: $12,762,921.00
Warwick Boulevard RelocationWarwick Boulevard, Route 60
System: Urban
Total Cost: $18,226,108.00
Total Funding: $1,600,000.00
System: Urban
Total Cost: $1,272,186.00
Total Funding: $1,187,075.00