Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Scope: Transit
Total Cost:
Total Funding: $450,000.00
Scope: Transit
Total Cost: NA
Total Funding: $852,000.00
ADA OperationsNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $10,663,000.00
ADP HardwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $2,124,000.00
ADP HardwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $171,000.00
ADP SoftwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $9,504,000.00
ADP SoftwareNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $58,000.00
System: Urban
Total Cost: $1,011,191.00
Total Funding: $1,100,000.00
System: Urban
Total Cost: $1,478,352.00
Total Funding: $1,478,352.00
System: Secondary
Total Cost: $1,638,947.00
Total Funding: $902,984.00
System: Urban
Total Cost: $52,753,548.00
Total Funding: $46,652,041.00
System: Urban
Total Cost: $285,905.00
Total Funding: $233,098.00
System: Urban
Total Cost: $894,227.00
Total Funding: $1,212,912.00
System: Urban
Total Cost: $750,000.00
Total Funding: $1,105,000.00
System: Urban
Total Cost: $150,000.00
Total Funding: $150,000.00
System: Urban
Total Cost: $3,786,764.00
Total Funding: $3,786,764.00
System: Secondary
Total Cost: $468,658.00
Total Funding: $2,015,954.00
Scope: Transit
Total Cost:
Total Funding: $1,666,000.00
Scope: Transit
Total Cost: NA
Total Funding: $46,000.00