Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Military Highway WideningMilitary Highway, Route 13
System: Urban
Total Cost: $60,476,095.00
Total Funding: $57,050,956.00
Military Highway WideningMilitary Highway, Route 13
System: Urban
Total Cost: $26,155,629.00
Total Funding: $26,990,720.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $42,872,452.00
Total Funding: $42,872,452.00
System: Urban
Total Cost: $93,335,958.00
Total Funding: $35,426,051.00
System: Urban
Total Cost: $19,215,146.00
Total Funding: $19,214,901.00
Fort Eustis Boulevard WideningFort Eustis Boulevard, Route 105
System: Primary
Total Cost: $3,085,581.00
Total Funding: $3,086,803.00
System: Secondary
Total Cost: $7,795,842.00
Total Funding: $7,803,133.00
System: Urban
Total Cost: $46,887,330.00
Total Funding: $55,516,925.00
Indian River Road WideningIndian River Road, Route 407
System: Urban
Total Cost: $56,103,000.00
Total Funding: $8,171,875.00
System: Interstate
Total Cost: $174,164,139.00
Total Funding: $66,195,476.00
System: Urban
Total Cost: $12,303,242.00
Total Funding: $13,267,702.00
System: Urban
Total Cost: $19,285,375.00
Total Funding: $16,251,000.00
George Washington Memorial Highway WideningGeorge Washington Memorial Highway, Route 17
System: Primary
Total Cost: $57,674,487.00
Total Funding: $57,674,487.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $4,718,400.00
Total Funding: $4,718,400.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $11,178,154.00
Total Funding: $12,762,921.00
System: Urban
Total Cost: $26,865,376.00
Total Funding: $21,887,574.00
System: Primary
Total Cost: $18,724,268.00
Total Funding: $18,724,268.00
Fort Eustis Boulevard Utility WorkFort Eustis Boulevard, Route 105
System: Primary
Total Cost: $1,361,257.00
Total Funding: $1,361,257.00
System: Urban
Total Cost: $21,702,923.00
Total Funding: $21,702,923.00
System: Urban
Total Cost: $5,434,263.00
Total Funding: $4,876,827.00