Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Scope: Transit
Total Cost: $0.00
Total Funding: -
System: Enhancement
Scope: Other
Total Cost: NA
Total Funding:
Riverside Hospital Bus Transfer CenterJ. Clyde Morris Boulevard, Route 312
System: Primary
Total Cost: $300,000.00
Total Funding: $3,222.00
Scope: Transit
Total Cost: NA
Total Funding: $14,000.00
Scope: Transit
Total Cost: NA
Total Funding: $14,500.00
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Portable RadiosNA, Route NA
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Scope: Transit
Total Cost: NA
Total Funding: $15,000.00
Scope: Transit
Total Cost: NA
Total Funding: $25,000.00
System: Secondary
Total Cost: $28,379.00
Total Funding: $28,379.00
System: Urban
Total Cost: $35,000.00
Total Funding: $35,000.00
Scope: Transit
Total Cost: NA
Total Funding: $40,000.00
System: Primary
Total Cost: $43,791.00
Total Funding: $43,791.00