Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
System: Urban
Total Cost: $1,710,797,322.00
Total Funding: $8,005,776.00
System: Primary
Total Cost: $1,540,364,778.00
Total Funding: $1,540,364,778.00
System: Primary
Total Cost: $1,286,025,296.00
Total Funding: $1,286,025,296.00
System: Primary
Total Cost: $924,790,724.00
Total Funding: $798,071,926.00
System: Interstate
Total Cost: $600,000,000.00
Total Funding: $140,000,000.00
System: Primary
Total Cost: $486,597,590.00
Total Funding: $486,597,590.00
System: Primary
Total Cost: $411,572,255.00
Total Funding: $416,402,984.00
System: Interstate
Total Cost: $311,303,820.00
Total Funding: $42,069,000.00
System: Interstate
Total Cost: $213,592,853.00
Total Funding: $168,211,949.00
System: Primary
Total Cost: $186,438,092.00
Total Funding: $186,438,092.00
System: Urban
Total Cost: $175,021,941.00
Total Funding: $175,391,214.00
System: Interstate
Total Cost: $174,164,139.00
Total Funding: $66,195,476.00
System: Interstate
Total Cost: $157,142,416.00
Total Funding: $107,353,352.00
System: Primary
Scope: Other
Total Cost: $155,924,903.00
Total Funding: $183,251,770.00
System: Interstate
Total Cost: $124,551,367.00
Total Funding: $7,832,371.00
System: Interstate
Total Cost: $104,902,350.00
Total Funding: $12,128,522.00
System: Interstate
Total Cost: $103,210,019.00
Total Funding: $17,890,709.00
System: Interstate
Total Cost: $100,000,000.00
Total Funding: $144,000,000.00
System: Urban
Total Cost: $93,335,958.00
Total Funding: $35,426,051.00
Hampton Boulevard ReconstructionHampton Boulevard, Route 337
System: Urban
Total Cost: $88,717,571.00
Total Funding: $89,887,392.00