Home » TIP Projects
Projects
Find a Project
Universal Project Code - The number assigned to a project when it is entered into the VDOT database. The UPC number remains with the project until completion and provides a good way to identify or check on the status of a project.
Indicates which system, program or mode of transportation the project falls within: Interstate, Primary, Urban, Secondary, Miscellaneous or Public Transportation. Descriptions of the systems are as follows:
  • The Interstate system contains projects identified as being part of the limited-access system of highways that carry route designations such as I-64, I-264, I-464, I-564 and I-664.
  • The Primary system contains projects located along major roadways that carry a route designation of less than 600.
  • The Urban system contains projects located within cities and towns.
  • The Secondary system contains projects located along minor roadways that carry a route designation of 600 or greater.
  • Miscellaneous projects are generally regional in nature and do not clearly fall into one of the above systems.
  • The Public Transportation system contains public transportation projects.
  • The Rail System contains passenger and freight rail projects.
Indicates the locality (or region) in which a project is located, or the agency under which a project is managed.
Scope of Work Broad category describing the work proposed in the project.
UPC#
Project Name
System
Scope
Cost
Funding
Military Highway WideningMilitary Highway, Route 13
System: Urban
Total Cost: $60,476,095.00
Total Funding: $57,050,956.00
System: Urban
Total Cost: $175,021,941.00
Total Funding: $175,391,214.00
System: Urban
Total Cost: $52,753,548.00
Total Funding: $46,652,041.00
Military Highway WideningMilitary Highway, Route 13
System: Urban
Total Cost: $26,155,629.00
Total Funding: $26,990,720.00
Warwick Boulevard WideningWarwick Boulevard, Route 60
System: Urban
Total Cost: $42,872,452.00
Total Funding: $42,872,452.00
System: Urban
Total Cost: $69,987,618.00
Total Funding: $69,998,799.00
System: Urban
Total Cost: $93,335,958.00
Total Funding: $35,426,051.00
System: Urban
Total Cost: $19,215,146.00
Total Funding: $19,214,901.00
System: Urban
Total Cost: $467,455.00
Total Funding: $838,528.00
System: Urban
Total Cost: $28,935,344.00
Total Funding: $28,935,344.00
Warwick Boulevard RelocationWarwick Boulevard, Route 60
System: Urban
Total Cost: $18,226,108.00
Total Funding: $1,600,000.00
System: Urban
Total Cost: $34,114,287.00
Total Funding: $36,207,143.00
Hampton Boulevard ReconstructionHampton Boulevard, Route 337
System: Urban
Total Cost: $88,717,571.00
Total Funding: $89,887,392.00
System: Urban
Total Cost: $46,887,330.00
Total Funding: $55,516,925.00
System: Urban
Total Cost: $68,925,638.00
Total Funding: $58,114,336.00
Indian River Road WideningIndian River Road, Route 407
System: Urban
Total Cost: $56,103,000.00
Total Funding: $8,171,875.00
System: Urban
Total Cost: $1,710,797,322.00
Total Funding: $8,005,776.00
Portsmouth Boulevard WideningPortsmouth Boulevard, Route 337
System: Urban
Total Cost: $21,580,000.00
Total Funding: $21,580,001.00
System: Urban
Total Cost: $125,000.00
Total Funding: $59,172.00